Nicola, Dave, Rick and I went to Pakenham for a weekend to visit Mark and Emma and view the progress of their new build.
 |
| We arrived Friday evening, when it was already dark |
 |
| so had to wait until the next day |
 |
| to appreciate the beauty of |
 |
| White Lake, where they are cottaging until they can move into the new house (hopefully by March) |
 |
| The new build is enclosed, windows and doors in, well and septic completed, in floor radiant heating, electrical and plumbing in. |
 |
| The porch will be screened with a view of the septic area and their bush. |
 |
| Cathedral ceilinged front entrance with stairs to the second floor. |
 |
| The second floor has the master bedroom with ensuite, coffee and sitting area |
 |
| and a deck. |
 |
| Epic rocks scattered around the property. |
 |
| Mark, with the help of friends, will be building the workshop but for now it is storing various vehicles and |
 |
| windows. |
 |
| Enough work, time for a nap |
 |
| and then a walk |
 |
| around the roaring metropolis of White Lake. |
 |
| Not sure why but it has a John Deere sign on the door (pic taken for Heather) |
 |
| Evening on White Lake. |
A fabulous local artisan pizza and games of cards rounded off the day.
No comments:
Post a Comment